NETWORK GATEWAY ECU(except GRMN) INSTALLATION

PROCEDURE


  1. INSTALL CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU)


    1. Engage the clamp.

    2. Connect the connector.

    3. Engage the hook to install the central gateway ECU.

    4. Install the screw.

      Note

      If it is difficult to tighten the screw to the specified torque, replace the screw with a Part No. 90168-W0001 screw.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
  2. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY

    Click here