NETWORK GATEWAY ECU(for GRMN) INSTALLATION

PROCEDURE


  1. INSTALL NETWORK GATEWAY ECU


    1. Install the network gateway ECU to the junction block bracket with the 2 nuts.

      Torque:
      7.5 N*m  { 76 kgf*cm, 66 in.*lbf }
    2. Connect the 3 connectors.

  2. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL (for LHD)

    Click here

  3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for LHD)

    Click here

  4. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY (for RHD)

    Click here

  5. INSTALL NO. 2 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY (for RHD)

    Click here

  6. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected Click here.