POWER MANAGEMENT CONTROL ECU INSTALLATION

PROCEDURE


  1. INSTALL POWER MANAGEMENT CONTROL ECU


    1. Install the power management control ECU with the nut.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    2. Connect the 2 connectors.

  2. INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL (for LHD)

    Click here

  3. INSTALL GLOVE COMPARTMENT DOOR ASSEMBLY (for RHD)

    Tech Tips

    Use the same procedure as for the LHD side Click here.