GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Temporarily install the generator assembly and alternator tensioner bracket slider with the 2 bolts.

    2. Connect the connector.

    3. Install the wire harness to terminal B with the nut.

      Torque:
      9.8 N*m  { 100 kgf*cm, 87 in.*lbf }
    4. Install the terminal cap

  2. INSTALL FAN AND GENERATOR V BELT

    Click here

  3. INSTALL UPPER RADIATOR SUPPORT SUB-ASSEMBLY

    Click here

  4. INSTALL HOOD LOCK ASSEMBLY

    Click here

  5. INSTALL FRONT AIRBAG SENSOR

    Click here

  6. INSTALL HEADLAMP UNIT ASSEMBLY LH

    Click here

  7. INSTALL HEADLAMP UNIT ASSEMBLY RH

    Tech Tips

    Use the same procedure as for the RH side.

  8. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }