PROCEDURE
INSTALL GENERATOR ASSEMBLY
Install the 2 wire harness clamp brackets to the generator assembly with the 2 bolts.
| 8.4 N*m | 86 kgf*cm | 74 in.*lbf |
Temporarily install the generator assembly and generator bracket to the timing chain cover sub-assembly with the 3 bolts.
Tighten the 3 bolts in the sequence shown in the illustration.
| Bolt (A) | ||
| 54 N*m | 551 kgf*cm | 40 ft.*lbf |
| Bolt (B) | ||
| 34 N*m | 347 kgf*cm | 25 ft.*lbf |
Connect the compressor with pulley assembly connector.
Engage the 2 clamps to connect the wire harness to the 2 wire harness clamp brackets.
Connect the wire harness to terminal B with the nut.
| 9.8 N*m | 100 kgf*cm | 87 in.*lbf |
Install the terminal cap.
INSTALL FAN AND GENERATOR V BELT
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
| 5.4 N*m | 55 kgf*cm | 48 in.*lbf |
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).