BLACK OUT TAPE(for Quarter Pillar) INSTALLATION

PROCEDURE


  1. INSTALL REAR QUARTER UPPER STRIPE


    1. Application precautions Click here.

    2. Clean the attachment surface (using an infrared light) Click here.

    3. Clean the attachment surface (using a tape removal disc) Click here.

    4. Apply new rear quarter upper stripe to the positions shown in the illustration.

      A01VKGPE03
      Text in Illustration
      *a Spot Weld - -
      Standard Measurement
      Dimension Measurement
      a 5.0 to 7.0 mm (0.197 to 0.275 in.)
      b 7.3 mm (0.236 in.)