PROCEDURE
INSTALL TRANSMISSION OIL COOLER
Apply a light coat of Toyota Genuine CVT fluid FE to 2 new O-rings and install them to the transmission oil cooler.
Install the transmission oil cooler to the continuously variable transaxle assembly with the 3 bolts.
Note
Make sure that the O-rings are not damaged or do not jump out of position during installation.
CONNECT WATER BY-PASS HOSE ASSEMBLY
Connect the 2 water by-pass hoses to the transmission oil cooler and slide the 2 hose clamps to secure them.
Note
Securely push the water by-pass hoses over each pipe fitting on the transmission oil cooler until the water by-pass hoses contact the rib on each pipe fitting.
ADD ENGINE COOLANT
INSPECT FOR ENGINE COOLANT LEAK
ADJUST CONTINUOUSLY VARIABLE TRANSAXLE FLUID
INSPECT FOR CONTINUOUSLY VARIABLE TRANSAXLE FLUID LEAK
INSTALL ENGINE UNDER COVER LH