PROCEDURE
INSTALL SHIFT LOCK CONTROL ECU SUB-ASSEMBLY
Engage the 3 claws to install the shift lock unit cover to the shift lock control ECU sub-assembly.
Connect the shift lock solenoid connector.
Engage the guide and 2 clamps to install the shift lock solenoid wire to the shift lock unit cover.
Engage the claw to install the shift lock control ECU sub-assembly with shift lock unit cover to the shift lock control unit assembly.
INSTALL LOWER POSITION INDICATOR HOUSING
Engage the 5 claws to install the lower position indicator housing to the shift lock control unit assembly.
INSTALL NO. 2 POSITION INDICATOR SLIDE COVER
Align the cutouts on the shank of the No. 2 position indicator slide cover and position indicator slide cover, and install the No. 2 position indicator slide cover to the position indicator slide cover.
INSTALL POSITION INDICATOR SLIDE COVER
| *a | Arrow |
Install the position indicator slide cover to the position indicator light housing.
Note
Install the position indicator slide cover so that its arrow mark points to the front of the vehicle.
INSTALL CONTROL POSITION INDICATOR PLATE
Engage the claw to install the control position indicator plate to the upper position indicator housing.
INSTALL UPPER POSITION INDICATOR HOUSING
Engage the 4 claws to install the upper position indicator housing to the position indicator light housing.
INSTALL POSITION INDICATOR LIGHT CAP
Install the position indicator light cap to the position indicator light bulb.
INSTALL POSITION INDICATOR LIGHT BULB
Install the position indicator light bulb to the indicator light wire sub-assembly.
INSTALL INDICATOR LIGHT WIRE SUB-ASSEMBLY
Turn the indicator light wire sub-assembly clockwise to install it to the position indicator light housing.
Engage the 3 clamps to install the indicator light wire sub-assembly to the position indicator light housing.
INSTALL POSITION INDICATOR HOUSING ASSEMBLY
Engage the 4 claws to install the position indicator housing assembly to the transmission floor shift assembly.