BACK-UP LIGHT SWITCH INSTALLATION

PROCEDURE


  1. INSTALL BACK-UP LIGHT SWITCH ASSEMBLY


    1. Using a deep socket wrench 27 mm, install the back-up light switch assembly with a new gasket to the manual transaxle assembly.

      Torque:
      40 N*m  { 410 kgf*cm, 30 ft.*lbf }
    2. Connect the back-up light switch connector.

  2. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for 2ZR-FE)

    Click here

  3. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY (for 2ZR-FE)

    Click here

  4. INSTALL AIR CLEANER CAP WITH AIR CLEANER HOSE (for 2ZR-FE)

    Click here

  5. CONNECT NO. 2 VENTILATION HOSE (for 2ZR-FE)

    Click here