PROCEDURE
INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY
Install the floor shift shift lever assembly with the 4 bolts.
Engage the 2 wire harness clamps.
CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY
| *1 | Control Select Cable |
| *2 | Clip A |
| *3 | Control Shift Cable |
| *4 | Clip B |
| *a | Protruding Portion |
| *b | Lock |
Install the control shift cable to the shift lever retainer.
Note
Install the cable with the protruding portion of the cable outer facing upward.
After installing, check that the lock of the cable outer is protruding beyond portion A, as shown in the illustration.
Install the control select cable to the shift lever retainer.
Note
Install the cable with the protruding portion of the cable outer facing upward.
After installing, check that the lock of the cable outer is protruding beyond portion A, as shown in the illustration.
Connect the control shift cable to the shift lever.
Connect the control select cable to the shift lever with the clip A.
Note
Connect the control select cable so that the adjusting mechanism lock of the control select cable is installed on the left side of the vehicle.
Insert the clip in the direction shown in the illustration.
Engage the clip B and connect the end part of the transmission control shift cable to the floor shift shift lever assembly.
ADJUST TRANSMISSION CONTROL SELECT CABLE
INSTALL REAR CONSOLE BOX