SHIFT LEVER ASSEMBLY(for TMMF Made) INSTALLATION

PROCEDURE


  1. INSTALL FLOOR SHIFT LEVER ASSEMBLY


    1. Engage the 2 clamps and the connect the wire harness.

    2. Install the floor shift lever assembly with the 4 bolts.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
  2. CONNECT FLOOR SHIFT CABLE TRANSMISSION CONTROL SELECT

    Click here

  3. ADJUST TRANSMISSION CONTROL SELECT CABLE

    Click here

  4. INSTALL REAR CONSOLE BOX ASSEMBLY

    Click here