PROCEDURE
INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY
Install the transmission control cable assembly with the 3 nuts.
Install the 2 cables to the control cable bracket with 2 new clips.
Connect the 2 cables to the transaxle and install the 2 washers and the 2 clips.
| *1 | Control Select Cable |
| *2 | Control Shift Cable |
| *a | Protruding Portion |
| *b | Lock |
Install the control shift cable to the shift lever retainer.
Note
Install the cable with the protruding portion of the cable outer facing upward.
After installing, check that the lock of the cable outer is protruding beyond portion A, as shown in the illustration.
Install the control select cable to the shift lever retainer.
Note
Install the cable with the protruding portion of the cable outer facing upward.
After installing, check that the lock of the cable outer is protruding beyond portion A, as shown in the illustration.
Connect the control shift cable to the shift lever.
Connect the control select cable to the shift lever with the clip.
Note
Connect the control select cable so that the adjusting mechanism lock of the control select cable is installed on the left side of the vehicle.
Insert the clip in the direction shown in the illustration.
ADJUST TRANSMISSION CONTROL SELECT CABLE
INSTALL REAR CONSOLE BOX ASSEMBLY
INSTALL FRONT NO. 2 FLOOR HEAT INSULATOR
Install the front No. 2 floor heat insulator with the 2 bolts.
INSTALL FRONT EXHAUST PIPE ASSEMBLY
CONNECT NO. 2 HEATED OXYGEN SENSOR CONNECTOR
Connect the connector of the No. 2 heated oxygen sensor.
INSTALL BATTERY CARRIER (for LHD)
INSTALL BATTERY CARRIER (for RHD)
INSTALL BATTERY TRAY
INSTALL BATTERY
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
INSPECT FOR EXHAUST GAS LEAK