PROCEDURE
INSTALL ENGINE STOP AND START ECU
Install the engine stop and start ECU to the junction block bracket with the 2 nuts.
| 7.5 N*m | 76 kgf*cm | 66 in.*lbf |
Connect the 3 engine stop and start ECU connectors.
INSTALL LOWER NO. 2 INSTRUMENT PANEL FINISH PANEL
INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
| 5.4 N*m | 55 kgf*cm | 48 in.*lbf |
When disconnecting the cable, some systems need to be initialized after the cable is reconnected (Click here).
REGISTER NUMBER OF STARTER OPERATIONS