STARTER(for Cold Area Specification Vehicles) INSTALLATION

PROCEDURE


  1. INSTALL FLYWHEEL HOUSING SIDE COVER

    Click here

  2. INSTALL STARTER ASSEMBLY


    1. Install the wire harness clamp bracket to the starter assembly with the bolt.

      Torque:
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
    2. Install the starter assembly to the cylinder block sub-assembly with the 2 bolts.

      Torque:
      37 N*m  { 377 kgf*cm, 27 ft.*lbf }
    3. Engage the clamp to connect the wire harness to the wire harness clamp bracket.

    4. Connect the wire harness to the terminal 30 with the nut.

      Torque:
      13.5 N*m  { 138 kgf*cm, 10 ft.*lbf }
    5. Close the terminal cap.

    6. Connect the starter assembly connector.

  3. CONNECT HEATER WATER HOSE INLET A (for CVT)


    1. Engage the clamp to connect the heater water hose inlet A to the heater bracket.

  4. INSTALL NO. 1 TRANSMISSION CONTROL CABLE BRACKET (for CVT)

    Click here

  5. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY (for CVT)

    Click here

  6. INSTALL BATTERY CARRIER

    Click here

  7. INSTALL BATTERY TRAY

    Click here

  8. INSTALL BATTERY

    Click here

  9. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (for CVT)

    Click here

  10. INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY (for CVT)

    Click here

  11. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (for CVT)

    Click here

  12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Torque:
    5.4 N*m  { 55 kgf*cm, 48 in.*lbf }

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here