ENGINE OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL OIL COOLER ASSEMBLY


    1. Check and clean the oil cooler assembly installation surface.

    2. Install 2 new oil cooler O-rings and a new oil cooler gasket to the oil filter bracket sub-assembly.

    3. Install the oil cooler assembly to the oil filter bracket sub-assembly with the 2 bolts, 2 nuts and 2 plate washers.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  2. CONNECT OIL COOLER HOSE


    1. A01VJ9RE04
      Text in Illustration
      *a View A
      *b RH of Engine
      *c Front of Engine

      Connect the oil cooler hose to the oil cooler assembly and slide the hose clip to secure it.

      Note

      Perform the installation with the hose clip at the correct angle.

  3. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY (w/ Air Conditioning System)

    Click here

  4. ADD ENGINE OIL

    Click here

  5. CHECK ENGINE OIL LEVEL

    Click here

  6. ADD ENGINE COOLANT

    Click here

  7. INSPECT FOR OIL LEAK

    Click here

  8. INSPECT FOR COOLANT LEAK

    Click here

  9. INSTALL CENTER ENGINE UNDER COVER

    Click here