ENGINE OIL COOLER INSTALLATION

PROCEDURE


  1. INSTALL OIL COOLER ASSEMBLY


    1. Check and clean the oil cooler installation surface.

    2. Install 2 new O-rings and a new oil cooler gasket to the oil filter bracket.

    3. Install the oil cooler with the 2 bolts and 2 nuts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  2. CONNECT OIL COOLER HOSE

    A01VJ9RE04
    Text in Illustration
    *a View A
    *b RH Side
    *c Front Side

    1. Connect the oil cooler hose.

  3. INSTALL COMPRESSOR ASSEMBLY WITH PULLEY (w/ Air Conditioning System)

    Click here

  4. ADD ENGINE OIL

    Click here

  5. CHECK ENGINE OIL LEVEL

    Click here

  6. ADD ENGINE COOLANT

    Click here

  7. INSPECT FOR OIL LEAK

    Click here

  8. INSPECT FOR COOLANT LEAK

    Click here

  9. INSTALL CENTER ENGINE UNDER COVER

    Click here