PROCEDURE
INSTALL INTAKE MANIFOLD
Install a new No. 1 intake manifold to head gasket onto the intake manifold.
Temporarily install the intake manifold onto the cylinder head sub-assembly with the 3 bolts and 2 nuts.
Tighten the 3 bolts and 2 nuts in the order shown in the illustration.
Connect the 2 wire harness clamp brackets to the intake manifold with the 2 bolts.
Engage the 2 clamps and connect the wire harness to the intake manifold.
Connect the connector of the manifold absolute pressure sensor.
CONNECT NO. 2 FUEL VAPOR FEED HOSE
Connect the No. 2 fuel vapor feed hose to the intake manifold.
CONNECT VENTILATION HOSE
Connect the ventilation hose to the intake manifold with the hose clamp.
CONNECT UNION TO CHECK VALVE HOSE
Connect the union to check valve hose to the intake manifold.
INSTALL NO. 1 EGR PIPE
Install a new No. 2 EGR pipe gasket onto the intake manifold.
Install a new EGR pipe gasket onto the EGR valve assembly.
Temporarily install the No. 1 EGR pipe with the 2 bolts and 2 nuts.
Tighten the 2 bolts and 2 nuts in the order shown in the illustration.
INSTALL NO. 1 HEATER BRACKET
Install the No. 1 heater bracket onto the intake manifold with the bolt.
Engage the clamp and connect the heater water hose inlet A to the No. 1 heater bracket.
INSTALL AIR CLEANER CASE SUB-ASSEMBLY
Install the air cleaner case sub-assembly with the 2 bolts.
INSTALL INLET NO. 1 AIR CLEANER
INSTALL AIR CLEANER FILTER ELEMENT SUB-ASSEMBLY
INSTALL THROTTLE WITH MOTOR BODY ASSEMBLY
INSTALL OUTER COWL TOP PANEL
INSTALL INNER COWL TOP TO COWL BRACE
INSTALL FRONT NO. 1 VENTILATOR SEAL
INSTALL FRONT AIR SHUTTER SEAL RH
INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
INSPECT INTAKE SYSTEM