PROCEDURE
INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)
Clean and degrease the threads of the PCV valve (ventilation valve sub-assembly) as well as the threaded holes of the ventilation case.
Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).
| Adhesive |
|---|
| Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent |
Note
To prevent contamination by foreign matter, install immediately after applying adhesive.
| *a | Torque Wrench Fulcrum Length |
Using a 22 mm ball joint lock nut wrench, install the PCV valve (ventilation valve sub-assembly) to the ventilation case.
Note
Do not start the engine for at least 1 hour after installation.
Tech Tips
Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.
When using a 22 mm ball joint lock nut wrench (fulcrum length of 150 mm (5.9 in.)) + torque wrench (fulcrum length of 162 mm (6.38 in.)):
10 N*m (102 kgf*cm, 7 ft.*lbf)
CONNECT VENTILATION HOSE
Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.
INSTALL SUPERCHARGER ASSEMBLY