PCV VALVE INSTALLATION

PROCEDURE


  1. INSTALL PCV VALVE (VENTILATION VALVE SUB-ASSEMBLY)


    1. Clean and degrease the threads of the PCV valve (ventilation valve sub-assembly) as well as the threaded holes of the ventilation case.

    2. Apply adhesive to 2 or 3 threads of the PCV valve (ventilation valve sub-assembly).

      Adhesive
      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent

      Note

      To prevent contamination by foreign matter, install immediately after applying adhesive.

    3. B0047KYC01
      *a Torque Wrench Fulcrum Length

      Using a 22 mm ball joint lock nut wrench, install the PCV valve (ventilation valve sub-assembly) to the ventilation case.

      Torque:
      Specified tightening torque
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }

      Note

      Do not start the engine for at least 1 hour after installation.

      Tech Tips


      • Calculate the torque wrench reading when changing the fulcrum length of the torque wrench.

        Click here

      • When using a 22 mm ball joint lock nut wrench (fulcrum length of 150 mm (5.9 in.)) + torque wrench (fulcrum length of 162 mm (6.38 in.)):

        10 N*m (102 kgf*cm, 7 ft.*lbf)

  2. CONNECT VENTILATION HOSE


    1. Connect the ventilation hose to the PCV valve (ventilation valve sub-assembly) and slide the clip to secure it.

  3. INSTALL SUPERCHARGER ASSEMBLY

    Click here