PROCEDURE
INSTALL EGR VALVE ASSEMBLY
TEMPORARILY INSTALL NO. 1 INTAKE MANIFOLD INSULATOR
Install a new No. 2 intake manifold to head gasket onto the cylinder head.
Temporarily install the No. 1 intake manifold insulator onto the EGR valve with the 2 bolts and nut.
INSTALL INTAKE MANIFOLD
Install a new No. 1 intake manifold to head gasket onto the intake manifold.
Temporarily install the intake manifold onto the No. 1 intake manifold insulator with the 2 bolts and 2 nuts.
Tighten the 4 bolts and 3 nuts in the order shown in the illustration.
Install the fuel pipe clamp onto the fuel tube sub-assembly.
Install the wire harness clamp bracket onto the intake manifold with the bolt.
Engage the 2 clamps and connect the wire harness to the wire harness clamp bracket and the intake manifold.
Install the hose clamp bracket onto the intake manifold with the bolt.
Engage the 2 clamps and connect the water by-pass hose assembly to the hose clamp bracket.
INSTALL INTAKE MANIFOLD STAY
Temporarily install the intake manifold stay onto the intake manifold with the 2 bolts.
Tighten the 2 bolts in the order shown in the illustration.
CONNECT VENTILATION HOSE
Connect the ventilation hose to the intake manifold with the hose clamp.
CONNECT BOOSTER VACUUM TUBE
Engage the clip and install the hose clamp onto the intake manifold.
Connect the booster vacuum tube connector to the intake manifold.
Connect the booster vacuum tube to the hose clamp.
CONNECT NO. 2 FUEL VAPOR FEED HOSE
Connect the No. 2 fuel vapor feed hose to the intake manifold with the hose clamp.
INSTALL MANIFOLD ABSOLUTE PRESSURE SENSOR
INSTALL OUTER COWL TOP PANEL
INSTALL INNER COWL TOP TO COWL BRACE
INSTALL FRONT NO. 1 VENTILATOR SEAL
INSTALL FRONT AIR SHUTTER SEAL RH
INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
INSPECT INTAKE SYSTEM