PROCEDURE
INSTALL EGR PIPE CONNECTOR
Install the 2 stud bolts to the EGR cooler assembly.
Install the new No. 1 EGR cooler gasket and EGR by-pass valve to the EGR cooler assembly.
Install the new No. 2 EGR cooler gasket and EGR pipe connector with the bolt and 2 nuts.
INSTALL EGR WITH COOLER PIPE SUB-ASSEMBLY
Install the new EGR pipe gasket and inlet EGR gasket to the cylinder head and electric EGR control valve.
Install the EGR cooler assembly with the 4 bolts and 2 nuts.
| *a | View A |
| *b | Front Side |
Connect the vacuum hose, No. 2 oil cooler hose and No. 2 water by-pass hose to the EGR cooler assembly.
Install the turbo pressure sensor with the bolt.
Connect the vacuum transmitting hose to the turbo pressure sensor.
Connect the 2 connectors and engage the wire harness clamp.
Install the wire harness with the bolt.
Connect the connector and engage the wire harness clamp.
INSTALL NO. 1 VACUUM SWITCHING VALVE ASSEMBLY
ADD ENGINE COOLANT
INSPECT FOR COOLANT LEAK
INSPECT FOR EXHAUST GAS LEAK
INSTALL NO. 1 ENGINE COVER