PURGE VALVE INSTALLATION

PROCEDURE


  1. INSTALL DUTY VACUUM SWITCHING VALVE


    1. Install the duty vacuum switching valve with the bolt.

      Torque:
      8.8 N*m  { 90 kgf*cm, 78 in.*lbf }
    2. Connect the No. 2 fuel vapor feed hose to the duty vacuum switching valve.

    3. Connect the No. 1 fuel vapor feed hose to the duty vacuum switching valve.

    4. Connect the duty vacuum switching valve connector.