EGR VALVE INSTALLATION

PROCEDURE


  1. INSTALL EGR VALVE GASKET


    1. Install a new EGR valve gasket to the cylinder head sub-assembly.

  2. INSTALL EGR VALVE ASSEMBLY


    1. A01VM8R

      Insert the stud bolt of the cylinder head sub-assembly into the EGR valve assembly, rotate the EGR valve assembly to avoid the fuel delivery pipe sub-assembly and cylinder head cover sub-assembly, and temporarily install the EGR valve assembly to the cylinder head sub-assembly.

    2. Install the wire harness clamp bracket to the cylinder head cover sub-assembly with the bolt.

      Torque:
      8.4 N*m  { 86 kgf*cm, 74 in.*lbf }
    3. Engage the 2 clamps to connect the wire harness to the wire harness clamp bracket.

    4. Connect the No. 2 water by-pass hose to the EGR valve assembly and slide the hose clip to secure it.

    5. Connect the EGR valve assembly connector.

  3. INSTALL INTAKE MANIFOLD

    Click here