FRONT CRANKSHAFT OIL SEAL INSTALLATION

PROCEDURE


  1. INSTALL TIMING CHAIN COVER OIL SEAL


    1. Apply MP grease to the lip of a new oil seal.

      Note

      Keep the lip free of foreign matter.

    2. A01VK2HE02

      Using SST and a hammer, tap in the timing chain cover oil seal until its surface is flush with the timing chain cover edge.

      SST
      09223-22010
      Oil seal tap in depth
      -0.5 to 1.0 mm (-0.0197 to 0.0394 in.)

      Note


      • Do not tap the oil seal at an angle.

      • Wipe off extra grease from the crankshaft.

  2. INSTALL CRANKSHAFT PULLEY


    1. Align the pulley set key with the key groove of the crankshaft pulley, and then slide on the crankshaft pulley.

    2. Using SST, install the crankshaft pulley bolt.

      SST
      09960-10010   ( 09962-01000, 09963-01000 )
      Torque:
      128 N*m  { 1305 kgf*cm, 94 ft.*lbf }
  3. INSTALL FAN AND GENERATOR V BELT

    Click here

  4. INSTALL INLET NO. 1 AIR CLEANER

    Click here

  5. INSPECT FOR ENGINE OIL LEAK

  6. INSTALL NO. 1 ENGINE COVER

    Click here

  7. INSTALL ENGINE UNDER COVER RH

    Click here

  8. INSTALL FRONT WHEEL RH

    Torque:
    103 N*m  { 1050 kgf*cm, 76 ft.*lbf }