PROCEDURE
INSTALL CAMSHAFT
Turn the crankshaft to set the key in the 70° BTDC position.
| *1 | TDC Mark |
| *2 | Key |
| *a | BTDC 70° |
Apply engine oil to the camshaft journal portion and cam portion.
Examine the front marks and numbers and check that the sequence is as shown in the illustration. Then, temporarily tighten the camshaft with the camshaft bearing caps and bolts.
|
Engine Front Side |
Note
Do not tilt the valve rocker arm when installing the camshaft onto the cylinder head.
Using several steps, temporarily tighten the bolts in the order shown in the illustration, and then tighten the bolts to the specified torque.
INSTALL CHAIN SUB-ASSEMBLY
INSTALL NO. 1 CHAIN VIBRATION DAMPER
INSTALL CHAIN TENSIONER SLIPPER
INSTALL NO. 1 CHAIN TENSIONER ASSEMBLY
INSTALL TIMING CHAIN COVER OIL SEAL
INSTALL TIMING CHAIN COVER SUB-ASSEMBLY (w/ DPF)
INSTALL TIMING CHAIN COVER SUB-ASSEMBLY (w/o DPF)
CONNECT WATER INLET HOSE LH
Connect the water inlet hose LH.
Tech Tips
The clip at the water inlet housing can be installed in any orientation, as long it does not contact any of the surrounding parts.
INSTALL CRANKSHAFT DAMPER SUB-ASSEMBLY
INSTALL NO. 3 TIMING CHAIN COVER (w/o DPF)
INSTALL NO. 2 TIMING CHAIN COVER (w/ DPF)
INSTALL NO. 2 TIMING CHAIN COVER (w/o DPF)
INSTALL ENGINE MOUNTING BRACKET RH
CHECK VALVE CLEARANCE
ADJUST VALVE CLEARANCE
INSTALL CYLINDER HEAD COVER SUB-ASSEMBLY
INSTALL HARNESS BRACKET
INSTALL V-RIBBED BELT TENSIONER ASSEMBLY
INSTALL VACUUM PUMP ASSEMBLY
INSTALL CAMSHAFT POSITION SENSOR
INSTALL NO. 2 CYLINDER HEAD COVER
INSTALL WATER BY-PASS PIPE SUB-ASSEMBLY
Install a new O-ring to the water by-pass pipe.
Note
Apply water to all around of the O-ring inserting hole surface of the water inlet housing before installing the water by-pass pipe.
Install the water by-pass pipe with the 2 bolts, in the order shown in the illustration.
| *a | View A |
| *b | Front |
| *c | LH |
Connect the oil cooler hose.
| *a | View A |
| *b | Upper |
Connect the No. 1 water by-pass hose.
INSTALL NO. 4 WATER BY-PASS HOSE
INSTALL NO. 2 OIL COOLER HOSE
INSTALL NO. 1 SUPPLY PUMP DRIVE COUPLING
TEMPORARILY TIGHTEN SUPPLY PUMP ASSEMBLY
INSTALL FUEL INLET PIPE SUB-ASSEMBLY
CONNECT NO. 2 FUEL HOSE
Connect the No. 2 fuel hose.
INSTALL NOZZLE LEAKAGE PIPE ASSEMBLY
INSTALL NOZZLE LEAKAGE PIPE SET CLAMP
INSTALL NO. 1 FUEL PIPE
INSTALL INTAKE AIR CONNECTOR WITH DIESEL THROTTLE BODY ASSEMBLY
INSTALL ENGINE OIL LEVEL DIPSTICK GUIDE SUB-ASSEMBLY
INSTALL ENGINE OIL LEVEL DIPSTICK SUB-ASSEMBLY
INSTALL ELECTRIC EGR CONTROL VALVE ASSEMBLY
INSTALL HARNESS BRACKET
INSTALL NO. 1 EGR COOLER BRACKET
INSTALL EGR WITH COOLER PIPE ASSEMBLY
INSTALL GENERATOR BRACKET
INSTALL GENERATOR ASSEMBLY
INSTALL ENGINE COVER BRACKET
INSTALL ENGINE ASSEMBLY