CAMSHAFT TIMING OIL CONTROL VALVE INSTALLATION

PROCEDURE


  1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE O-RING

    Tech Tips

    This procedure is performed when the camshaft timing oil control valve O-ring must be replaced with a new one.


    1. Install a new camshaft timing oil control valve O-ring to the camshaft timing oil control valve assembly.

      Note

      Do not damage the camshaft timing oil control valve O-ring

  2. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY


    1. A00489S

      Apply a light coat of engine oil to the camshaft timing oil control valve O-ring

    2. Install the camshaft timing oil control valve assembly to the cylinder head cover sub-assembly with the bolt.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }

      Note


      • Do not allow foreign matter to contact the oil seal face of the camshaft timing oil control valve assembly (connecting surface with the cylinder head cover sub-assembly).

      • Make sure that the camshaft timing oil control valve assembly is not cracked or moved out of place when installing the camshaft timing oil control valve assembly.

      • If the camshaft timing oil control valve assembly has been struck or dropped, replace it.

    3. Connect the camshaft timing oil control valve assembly connector.

  3. INSPECT FOR ENGINE OIL LEAK

    Click here

  4. INSTALL NO. 1 ENGINE COVER


    1. Engage the 3 grommets to install the No. 1 engine cover to the cylinder head cover sub-assembly.