EJECTOR TUBE INSTALLATION

PROCEDURE


  1. INSTALL BRAKE BOOSTER VACUUM EJECTOR


    1. Engage the 2 claws to install the 2 vacuum hose clamps to the brake booster vacuum ejector.

    2. B0045CYC01
      *1 No. 2 Air Hose
      *2 Union To Connector Tube Hose
      *3 Check Valve To Connector Tube Hose
      *a To Air Cleaner
      *b To Brake Booster
      *c To Intake Manifold

      Engage the clamp to install the brake booster vacuum ejector to the hose bracket.

      Note

      Be sure to install the brake booster vacuum ejector in the correct direction.

    3. Connect the No. 2 air hose, union to connector tube hose and 2 check valve to connector tube hoses to the brake booster vacuum ejector and slide the 4 hose clips to secure them.

  2. INSTALL OUTER COWL TOP PANEL (for LHD)

    Click here

  3. INSTALL OUTER COWL TOP PANEL (for RHD)

    Click here

  4. INSTALL INNER COWL TOP TO COWL BRACE (for LHD)

    Click here

  5. INSTALL INNER COWL TOP TO COWL BRACE (for RHD)

    Click here

  6. INSTALL FRONT NO. 1 VENTILATOR SEAL (for LHD)

    Click here

  7. INSTALL FRONT NO. 1 VENTILATOR SEAL (for RHD)

    Click here

  8. INSTALL FRONT AIR SHUTTER SEAL RH (for LHD)

    Click here

  9. INSTALL FRONT AIR SHUTTER SEAL RH (for RHD)

    Click here

  10. INSTALL WINDSHIELD WIPER MOTOR AND LINK

    Click here