POWER STEERING ECU(for LHD) INSTALLATION

PROCEDURE


  1. INSTALL POWER STEERING ECU ASSEMBLY


    1. Install the power steering ECU assembly with the 2 nuts.

      Torque:
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
    2. Connect the 4 connectors.

    3. Engage the wire harness clamp.

  2. INSTALL TRANSMISSION CONTROL ECU ASSEMBLY (for Multi-Mode Manual Transaxle)

    Click here

  3. INSTALL UPPER INSTRUMENT PANEL SUB-ASSEMBLY

    Click here

  4. TORQUE SENSOR ZERO POINT CALIBRATION

    Click here

  5. ASSIST MAP WRITING

    Click here