FRONT SUSPENSION MEMBER(for 2WD) INSTALLATION

PROCEDURE


  1. INSTALL FRONT STABILIZER BAR

    Click here

  2. INSTALL RACK AND PINION POWER STEERING GEAR ASSEMBLY

    Click here

  3. INSTALL NO. 2 SIDE RAIL REINFORCEMENT LH


    1. B004STU

      Install the No. 2 side rail reinforcement LH with the 2 bolts and 2 nuts.

      Torque:
      20 N*m  { 204 kgf*cm, 15 ft.*lbf }
  4. INSTALL NO. 2 SIDE RAIL REINFORCEMENT RH

    Tech Tips

    Perform the same procedure as for the LH side.

  5. INSTALL FRONT ENGINE MOUNTING INSULATOR

    Click here

  6. CONNECT FRONT FRAME CROSSMEMBER SUB-ASSEMBLY

    Click here

  7. INSTALL ENGINE AND TRANSMISSION

    Click here