PROCEDURE
INSTALL COOLER DRYER
| *a | Modulator |
Using needle-nose pliers, install a new cooler dryer to the modulator.
Sufficiently apply compressor oil to the 3 new O-rings and the fitting surface of a new cap.
| Compressor Oil |
|---|
| ND-OIL 11 or equivalent |
Do not use any compressor oil other than ND-OIL 11 or equivalent. If any compressor oil other than ND-OIL 11 or equivalent is used, compressor motor insulation performance may decrease, resulting in leakage of electric power.
Keep the O-ring and O-ring fitting surface free of foreign matter.
| *a | Modulator |
Using a 14 mm straight hexagon socket wrench, install the cap to the modulator.
| 4.0 N*m | 41 kgf*cm | 35 in.*lbf |
Make sure not to cut the O-ring while installing it. (Cut O-rings cannot be installed)