| DTC Code | DTC Name |
|---|---|
| BASIC INSPECTION |
DESCRIPTION
When replacing the No. 1 hybrid vehicle supply stack sub-assembly or No. 2 hybrid vehicle supply stack sub-assembly, it is necessary to check, adjust and equalize the SOC of the HV battery. Otherwise, the engine may run longer than normal, resulting in a decrease in fuel efficiency.
PROCEDURE
READ VALUE USING TECHSTREAM (Hybrid Battery SOC)
Connect the Techstream to the DLC3.
Turn the power switch on (IG).
Turn the Techstream on.
Enter the following menus: Powertrain / HV Battery / Data List / Hybrid Battery SOC.
Read the Data List.
| Tester Display |
|---|
| Hybrid Battery SOC |
| Result | ||||||
|---|---|---|---|---|---|---|
|
Turn the power switch off.
| A |
|
GO TO STEP 3 Click here |
| B |
|
ADJUST HV BATTERY SOC
Tech Tips
If the following procedure (charging or discharging of the HV battery) cannot be performed due to the condition of the vehicle, proceed to the next step.
Apply the parking brake and chock all 4 wheels.
Connect the Techstream to the DLC3.
Turn the power switch on (IG).
Turn the Techstream on.
Enter the following menus: Powertrain / HV Battery / Data List / Hybrid Battery SOC.
Depress the accelerator pedal and brake pedal simultaneously or leave the vehicle with neutral (N) selected until the value of Data List item "Hybrid Battery SOC" is between 55% and 65%.
| Tester Display |
|---|
| Hybrid Battery SOC |
Tech Tips
Depressing the accelerator pedal and brake pedal simultaneously will cause the HV battery to charge and the value of "Hybrid Battery SOC" to increase.
Leaving the vehicle with neutral (N) selected will cause the HV battery to discharge and the value of "Hybrid Battery SOC" to decrease.
Turn the power switch off.
| Result | ||
|---|---|---|
|
| NEXT |
|
REPLACE HV BATTERY (NO. 1 HV SUPPLY STACK SUB-ASSEMBLY or NO. 2 HV SUPPLY STACK SUB-ASSEMBLY)
| Result | ||
|---|---|---|
|
| NEXT |
|
ROAD TEST
Turn the power switch on (READY).
Drive the vehicle on urban roads for approximately 10 minutes.
Tech Tips
Perform this procedure in order to ensure the accuracy of the inspection in the next step.
Turn the power switch off.
| Result | ||
|---|---|---|
|
| NEXT |
|
READ VALUE USING TECHSTREAM (Delta SOC)
Connect the Techstream to the DLC3.
Turn the power switch on (IG).
Turn the Techstream on.
Enter the following menus: Powertrain / HV Battery / Data List / Delta SOC.
Check and Record the Data List.
| Tester Display |
|---|
| Hybrid Battery SOC |
| Result | ||||||
|---|---|---|---|---|---|---|
|
| Tester Display |
|---|
| Delta SOC |
Turn the power switch off.
| A |
|
END |
| B |
|
TIME TO EQUALIZE SOC
According to the value of Data List item "Delta SOC" recorded in the previous step, equalize the SOC.
| "Delta SOC" | Time to Equalize SOC (Total time necessary to leave power switch off) |
|---|---|
| 6 to 10% | 29 hours |
| 11 to 15% | 49 hours |
| 16 to 20% | 66 hours |
| 21 to 25% | 85 hours |
| 26 to 30% | 103 hours |
Tech Tips
SOC equalization is performed when the power switch is off.
It is not necessary to leave the power switch off continuously for the time shown in the table. The time shown is the cumulative time the power switch must be off after a hybrid vehicle supply stack sub-assembly has been replaced for SOC equalization to complete.
| Result | ||
|---|---|---|
|
| NEXT |
|
END |