PROCEDURE
INSPECT NO. 1 HEIGHT CONTROL VALVE SUB-ASSEMBLY
| *a | Component without harness connected (No. 1 Height Control Valve Sub-assembly) |
Measure the resistance according to the value(s) in the table.
| Tester Connection | Condition | Specified Condition |
|---|---|---|
| A38-1 (RH+) - A38-2 (E) | at 20°C (68°F) | 9.36 to 10.14 Ω |
| A38-3 (LH+) - A38-2 (E) |
Tech Tips
If the result is not as specified, replace the No. 1 height control valve sub-assembly.
| *a | Component without harness connected (No. 1 Height Control Valve Sub-assembly) |
Check the operating sound of the height control valve when battery voltage is applied to the terminals.
| OK | |||||
|---|---|---|---|---|---|
|
Tech Tips
If the result is not as specified, replace the No. 1 height control valve sub-assembly.