QUARTER WINDOW MOULDING INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips


  • Use the same procedure for the RH and LH sides.

  • The procedure listed below is for the LH side.

PROCEDURE


  1. INSTALL UPPER QUARTER WINDOW MOULDING LH


    1. B000Q8IC01
      B004C4F Order of Install
      B004B1M Install in this Direction (1)
      B004CG0 Protective Tape

      Set the upper quarter window moulding LH in the direction indicated by arrow 1 shown in the illustration, attach the clips and install the upper quarter window moulding LH.

    2. Remove the protective tape.

  2. INSTALL REAR ROOF SIDE GARNISH SUB-ASSEMBLY LH

    Click here

  3. INSTALL ROOF DRIP SIDE FINISH MOULDING LH

    Click here