WINDSHIELD OUTSIDE MOULDING INSTALLATION

CAUTION / NOTICE / HINT

Tech Tips


  • Use the same procedure for the RH and LH sides.

  • The procedure listed below is for the LH side.

PROCEDURE


  1. INSTALL ROOF DRIP SIDE FINISH MOULDING LH


    1. B000RGJC01
      B004B1M Install in this Direction

      Attach the claws and install a new roof drip side finish moulding LH as shown in the illustration.

    2. B000SK6

      Attach the claws.

    3. Remove the protective tape.