PROCEDURE
INSTALL OIL COOLER ASSEMBLY
Install 2 new gaskets to the oil bracket sub-assembly.
Install the oil cooler assembly with the 2 bolts and 2 nuts.
CONNECT WATER BY-PASS HOSE
Connect the 2 water by-pass hoses.
ADD ENGINE OIL
CHECK ENGINE OIL LEVEL
ADD ENGINE COOLANT
INSPECT FOR ENGINE OIL LEAK
INSPECT FOR COOLANT LEAK
INSTALL STRUT BAR BRACKET SUPPORT SUB-ASSEMBLY
INSTALL NO. 2 ENGINE UNDER COVER ASSEMBLY
INSTALL NO. 1 ENGINE UNDER COVER ASSEMBLY
INSTALL V-BANK COVER SUB-ASSEMBLY
INSTALL RADIATOR SUPPORT TO FRAME SEAL RH
INSTALL LOWER RADIATOR AIR DEFLECTOR