CAUTION / NOTICE / HINT
The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during EGR valve assembly removal/installation are shown below.
| Replaced Part or Performed Procedure | Necessary Procedure | Effect/Inoperative Function when Necessary Procedure not Performed | Link |
|---|---|---|---|
|
Inspection After Repair |
|
|
CAUTION:
To prevent burns, do not touch the engine, exhaust pipe or other high temperature components while the engine is hot.
PROCEDURE
REMOVE INTAKE AIR SURGE TANK ASSEMBLY
DISCONNECT GENERATOR CABLE AND MOTOR CABLE (for LHD)
Detach the 2 clamps and disconnect the generator cable from the 2 engine motor cable brackets.
Detach the clamp and disconnect the motor cable from the engine motor cable bracket.
REMOVE WATER BY-PASS HOSE
Slide the clamp and remove the water by-pass hose from the EGR valve assembly.
DISCONNECT NO. 15 WATER BY-PASS HOSE
Slide the clamp and disconnect the No. 15 water by-pass hose from the EGR valve assembly.
REMOVE EGR VALVE ASSEMBLY
CAUTION:
To prevent burns, do not touch the engine, exhaust pipe or other high temperature components while the engine is hot.
Disconnect the connector from the EGR valve assembly.
Remove the 2 bolt, 2 nuts and EGR valve assembly from the intake manifold and EGR cooler assembly.
Remove the 2 gaskets from the intake manifold and EGR valve assembly.