ENGINE UNIT INSTALLATION

PROCEDURE


  1. INSTALL IGNITION COIL ASSEMBLY

    Click here

  2. INSTALL FUEL INJECTOR SEAL

    Click here

  3. INSTALL FUEL INJECTOR ASSEMBLY (for Direct Injection)

    Click here

  4. INSTALL FUEL DELIVERY PIPE RH

    Click here

  5. INSTALL FUEL DELIVERY PIPE WITH SENSOR ASSEMBLY LH

    Click here

  6. INSTALL NO. 2 FUEL PIPE SUB-ASSEMBLY

    Click here

  7. SET FUEL PUMP ASSEMBLY

    Click here

  8. TEMPORARILY INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY

    Click here

  9. INSTALL FUEL PUMP ASSEMBLY

    Click here

  10. INSTALL NO. 1 FUEL PIPE SUB-ASSEMBLY

    Click here

  11. INSTALL INTAKE MANIFOLD

    Click here

  12. INSTALL FUEL INJECTOR ASSEMBLY (for Port Injection)

    Click here

  13. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY

    Click here

  14. INSTALL WIRE HARNESS CLAMP BRACKET (for RHD)

    B000OIGC06
    *1 Oil Cooler Outlet Hose Bracket - -
    B004C4F Bolt B004ANI V-bank Cover Bracket

    1. Install the wire harness clamp bracket to the cylinder head cover RH with the V-bank cover bracket.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Install the V-bank cover bracket to the cylinder head LH.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Install the oil cooler outlet hose bracket with the bolt.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    4. Install the 14 wire harness clamp brackets with the 17 bolts.

      Torque:
      for Bolt A
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
      for Bolt B
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      for Bolt C
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
      for Bolt D
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      for Bolt E
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }
    5. Install the wire harness clamp bracket to the wire harness protector of the cylinder head cover RH.

  15. INSTALL WIRE HARNESS CLAMP BRACKET (for LHD)

    B000R14C02
    *1 Oil Cooler Outlet Hose Bracket - -
    B004C4F Bolt B004ANI V-bank Cover Bracket

    1. Install the wire harness clamp bracket to the cylinder head cover RH with the V-bank cover bracket.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Install the V-bank cover bracket to the cylinder head LH.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    3. Install the oil cooler outlet hose bracket with the bolt.

      Torque:
      9.0 N*m  { 92 kgf*cm, 80 in.*lbf }
    4. Install the 15 wire harness clamp brackets with the 18 bolts.

      Torque:
      for Bolt A
      8.0 N*m  { 82 kgf*cm, 71 in.*lbf }
      for Bolt B
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
      for Bolt C
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
      for Bolt D
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
      for Bolt E
      29 N*m  { 296 kgf*cm, 21 ft.*lbf }
    5. Install the wire harness clamp bracket to the wire harness protector of the cylinder head cover RH.

  16. INSTALL ENGINE WIRE

  17. INSTALL INTAKE AIR SURGE TANK ASSEMBLY

    Click here

  18. INSTALL NO. 2 WATER BY-PASS PIPE ASSEMBLY


    1. Connect the No. 2 water by-pass pipe assembly to the No. 1 water outlet pipe and slide the hose clamp to secure the hose.

    2. Install the No. 2 water by-pass pipe assembly with the 2 bolts.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  19. INSTALL EGR COOLER ASSEMBLY

    Click here

  20. INSTALL EGR VALVE ASSEMBLY

    Click here

  21. INSTALL THROTTLE BODY BRACKET

    Click here

  22. INSTALL NO. 3 WATER BY-PASS HOSE ASSEMBLY


    1. Connect the No. 3 water by-pass hose assembly to the EGR cooler assembly and slide the hose clamp to secure the hose.

    2. Install the No. 3 water by-pass hose assembly with the nut.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
  23. INSTALL NO. 4 WATER BY-PASS HOSE


    1. Install the No. 4 water by-pass hose and slide the 2 hose clamps to secure the hose.

  24. INSTALL WATER BY-PASS PIPE ASSEMBLY (w/ Oil Cooler)


    1. Install the water by-pass pipe assembly with the bolt and nut.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Install the 4 water by-pass hoses and slide the 4 hose clamps to secure the hose.

  25. INSTALL WATER INLET CAP (w/o Oil Cooler)


    1. Install the 2 water inlet caps and slide the 2 hose clamps to secure the cap.

  26. INSTALL WATER HOSE SUB-ASSEMBLY


    1. Install the 2 water hose sub-assembly and slide the 2 hose clamps to secure the hose.

  27. INSTALL NO. 2 WATER BY-PASS HOSE


    1. Install the No. 2 water by-pass hose and slide the 2 hose clamps to secure the hose.

  28. INSTALL NO. 6 WATER BY-PASS HOSE


    1. Install the No. 6 water by-pass hose and slide the 2 hose clamps to secure the hose.

  29. INSTALL NO. 1 COMPRESSOR MOUNTING BRACKET


    1. Install the No. 1 compressor mounting bracket with the 2 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
  30. INSTALL COMPRESSOR WITH MOTOR ASSEMBLY

    Click here

  31. INSTALL V-RIBBED BELT

    Click here

  32. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET LH


    1. Install the front No. 1 engine mounting bracket LH with the 4 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
  33. INSTALL FRONT NO. 1 ENGINE MOUNTING BRACKET RH


    1. Install the front No. 1 engine mounting bracket RH with the 4 bolts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }