HV BATTERY STACK DISCHARGING

CAUTION / NOTICE / HINT

CAUTION:

It is possible that the voltage of the HV battery will be recovered. Therefore, dispose of the HV battery within 1 week of performing the HV battery stack discharge operation.

PROCEDURE


  1. DISCHARGING (WHEN USING THE LI-ION BATTERY DISCHARGER)

    CAUTION:

    Be sure to wear insulated gloves and protective goggles.

    Note


      Make sure to observe the following points when using the Li-ion battery discharger.

    • Set it in a secure, flat place.

    • Set it in a dry place protected from dust and water.

    • Set it in a position where illumination of the LED indicators can be observed.

    • Do not block the ventilation holes or cooling fans.


    1. Select Li-ion battery connection cables


      1. B000RNHN01
        *1 TTDC TM4216-61

        Confirm the type of the Li-ion battery connection cable as indicated by the tag shown in the illustration. (Type: TM4216-61)

    2. Install Li-ion battery connection cable


      1. B000TJK

        Set the Li-ion battery discharger as shown in the illustration.

      2. B000PF3C04
        *a Connector A

        Connect the Li-ion battery connection cable connector (A) to the Li-ion battery discharger connector (A).

        Note

        Make sure that the connector is connected securely.

      3. B000QQTC04
        *a Connector B

        Connect the Li-ion battery connection cable connector (B) to the Li-ion battery discharger connector (B).

        Note

        Make sure that the connector is connected securely.

      4. B000QD0

        Set the Li-ion battery discharger as shown in the illustration.

        Tech Tips

        The Li-ion battery discharger is set on its side so that the ventilation holes will not be blocked.

    3. Discharge the HV supply stack sub-assembly.

      Tech Tips


      • Use the same procedure for the No. 1 HV supply stack sub-assembly and No. 2 HV supply stack sub-assembly.

      • The procedure listed below is for the No. 1 HV supply stack sub-assembly.


      1. B000SUJ

        Connect the Li-ion battery connection cable connectors (orange) to the 2 high-voltage connectors (orange) of the No. 1 HV supply stack sub-assembly.

      2. B000QGA

        Confirm that all of the LED indicators are illuminated as shown in the following table.

        CAUTION:

        If all of the LED indicators of the Li-ion battery discharger listed in the following table are not illuminated, the HV supply stack sub-assembly cannot be discharged using the Li-ion battery discharger. Make sure to soak the HV supply stack sub-assembly in a salt water solution to complete discharging.

        LED Indicator Illumination Status (When discharge has started normally)
        Item LED Indicator No. LED Indicator Illumination Status
        No. 1 HV supply stack sub-assembly 1 to 42 Illuminated
        No. 2 HV supply stack sub-assembly 1 to 42 Illuminated
      3. Confirm that the cooling fans operate.

        B000OKTC03
        *a Cooling Fans - -

        Tech Tips


        • To discharge the HV supply stack sub-assembly completely, continue discharging for at least 1 hour after the LED indicators have turned off.

        • Discharge of a fully charged HV supply stack sub-assembly will complete within 5 hours (including 1 hour waiting time after the LED indicators have turned off).

    4. Confirm discharge completion


      1. B000OJ8

        Confirm that all of the LED indicators of the Li-ion battery discharger have turned off.

        Note


        • Create a shadow as shown in the illustration and visually check the LED lights from the front.

        • Check that the LED lights are completely off.

      2. Continue to discharge the battery for 1 hour after all of the LED indicators of the Li-ion battery discharger have turned off.

    5. Disconnect Li-ion battery connection cable


      1. B000SUJ

        Disconnect the Li-ion battery connection cable connector (orange) from the 2 high-voltage connectors (orange) of the No. 1 HV supply stack sub-assembly.

    6. Remove Li-ion battery connection cable


      1. B000PVD

        Set the Li-ion battery discharger as shown in the illustration.

      2. B000RM8C04
        *a Connector B

        Disconnect the Li-ion battery connection cable connector (B) from the Li-ion battery discharger connector (B).

      3. B000S7RC04
        *a Connector A

        Disconnect the Li-ion battery connection cable connector (A) from the Li-ion battery discharger connector (A).

  2. DISCHARGING (WHEN USING THE SALT WATER SOLUTION)

    CAUTION:

    Be sure to wear insulated gloves and protective goggles.

    Note


    • When discharging using salt water solution, first add a measured amount of water to the container, and then add the concentrated salt water solution.

    • Calculate the salt water concentration based on the measured volume of water in the container so that a 1% salt water solution will be made after adding the concentrated salt water solution to the water in the container where the HV supply stack sub-assembly is set.


    1. Prepare HV supply stack sub-assembly


      1. B000PCCC01
        *a Example
        *b Container A

        Set the HV supply stack sub-assembly in the container (A).

    2. Prepare to discharge (Add water to container)


      1. B000THIC01
        *a Example
        *b Container B

        Measure the water capacity of the container (B).

        Tech Tips

        Water capacity of the container (B) is assumed as X (liter).

      2. B000O7ZC01
        *a Example
        *b Water Surface
        *c Container A
        *d Container B

        Using the container (B), add water to the container (A) until the HV supply stack sub-assembly is completely submerged.

        Note

        Make sure to record the times the container (B) was filled with water to add water to the container (A).

      3. Using the following formula, calculate the amount of water added to the container (A).

        Amount of water added to the container (A)
        Y (liter) = Water capacity of the container (B) x Number of times the container (B) was filled with water to submerge the HV supply stack sub-assembly

        Tech Tips

        Amount of water added to the container (A) is assumed as Y (liter).

    3. Prepare salt water solution


      1. B000SJWC01
        *a Example
        *b Container B

        While measuring the amount of water, fill about half of the container (B) with water.

        Tech Tips

        Amount of water added to the container (B) is assumed as Z (liter).

      2. Calculate the amount of salt to be added to the container (A) so that a 1% salt water solution will be made.

        Amount of Salt
        Amount of salt (kg) = (Y (liter) + Z (liter)) x 0.01
      3. B000SZDC01
        *a Example
        *b Container B

        Add the calculated amount of salt to the container (B) and stir it thoroughly.

    4. Add salt water solution


      1. B000O5X

        Add the concentrated salt water solution to the container (A).

    5. Discharge


      1. Leave the HV supply stack sub-assembly as is for 24 hours or more until discharge is complete.

        CAUTION:


        • Do not place a lid on the container.

        • Make sure to leave the HV supply stack sub-assembly and container as is for 24 hours or more.

        • Display a warning sign to inform others that discharge is being performed.

    6. Confirm discharge completion


      1. Check that bubbles are not forming in the container.

        Note

        If bubbles are forming, discharge may not be completed yet. Do not place a lid on the container.

    7. Display a warning sign such as "DO NOT TOUCH! (DISCHARGE BEING PERFORMED) to inform others. Make a copy of the warning sign and place it near the HV supply stack sub-assembly being discharged.

      B000O0U