FUSE BOX INSTALLATION

PROCEDURE


  1. INSTALL HYBRID BATTERY TERMINAL BLOCK

    CAUTION:

    Be sure to wear insulated gloves and protective goggles.


    1. B0049SX

      Attach the guide and install the hybrid battery terminal block.

    2. Connect the 2 connectors.

      Note

      Make sure that the connector is connected securely.

  2. INSTALL UPPER HV BATTERY COVER PANEL

    Click here

  3. INSTALL HV BATTERY ASSEMBLY

    Click here

  4. PERFORM HIGH VOLTAGE FUSE ACCUMULATED LOAD HISTORY RESET

    Click here