CAUTION / NOTICE / HINT
Tech Tips
Use the same procedure for RHD and LHD vehicles.
The procedure listed below is for LHD vehicles.
Use the same procedure for the RH and LH sides.
The procedure listed below is for the LH side.
PROCEDURE
INSTALL ROOF SIDE RAIL GARNISH SUB-ASSEMBLY LH
| *1 | Butyl Tape |
Apply new butyl tape to the roof side rail garnish sub-assembly LH.
|
Install in this Direction |
Attach the pins.
Attach the clip to the roof side rail garnish sub-assembly LH.
Tech Tips
Press the butyl tape firmly to attach it.
|
Order of Install |
|
Install in this Direction |
Set the roof side rail garnish LH in the direction indicated by arrow shown in the illustration and attach the clips and claw.
Install the roof side rail garnish sub-assembly LH with the 7 screws.
INSTALL FRONT ROOF SIDE RAIL WEATHERSTRIP RETAINER LH
|
Install in this Direction |
Insert the clip and attach the guides.
Install the front roof side rail weatherstrip retainer LH with the 9 screws.
INSTALL FRONT ROOF SIDE RAIL WEATHERSTRIP LH
INSTALL REAR ROOF SIDE GARNISH SUB-ASSEMBLY LH
INSTALL ROOF DRIP SIDE FINISH MOULDING LH