| DTC Code | DTC Name |
|---|---|
| B242E | Open in IG Circuit |
DESCRIPTION
The No. 1 headlight ECU sub-assembly operates using the power source voltage input from the IG terminal and ECUB terminal.
The IG terminal power source voltage is supplied by turning the IG1 relay to ON.
The No. 1 headlight ECU sub-assembly receives engine switch on (IG) signals from the main body ECU (multiplex network body ECU) via CAN communication, compares the engine switch on (IG) signal and the power source voltage supply condition of the IG terminal and monitors the result.
| DTC No. | Detection Item | DTC Detection Condition | Trouble Area | DTC Output from |
|---|---|---|---|---|
| B242E | Open in IG Circuit |
Detection condition:
Malfunction status:
Malfunction duration: |
|
|
WIRING DIAGRAM
CAUTION / NOTICE / HINT
Note
Inspect the fuses for circuits related to this system before performing the following procedure.
If the No. 1 headlight ECU sub-assembly LH has been replaced, it is necessary to synchronize the vehicle information.
PROCEDURE
CHECK FOR DTC
Clear the DTCs.
Turn the engine switch on (IG) and wait for at least 10 seconds.
Check for DTCs.
| OK |
|---|
| DTC B242E is not output. |
| Result | ||||||||
|---|---|---|---|---|---|---|---|---|
|
| A |
|
USE SIMULATION METHOD TO CHECK Click here |
| C |
|
CHECK HARNESS AND CONNECTOR (NO. 1 HEADLIGHT ECU SUB-ASSEMBLY RH - BATTERY AND BODY GROUND) Click here |
| B |
|
CHECK HARNESS AND CONNECTOR (NO. 1 HEADLIGHT ECU SUB-ASSEMBLY LH - BATTERY AND BODY GROUND)
| *a | Front view of wire harness connector (to No. 1 Headlight ECU Sub-assembly LH) |
Disconnect the No. 1 headlight ECU sub-assembly LH connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE NO. 1 HEADLIGHT ECU SUB-ASSEMBLY LH Click here |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |
CHECK HARNESS AND CONNECTOR (NO. 1 HEADLIGHT ECU SUB-ASSEMBLY RH - BATTERY AND BODY GROUND)
| *a | Front view of wire harness connector (to No. 1 Headlight ECU Sub-assembly RH) |
Disconnect the No. 1 headlight ECU sub-assembly RH connector.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | ||||||
|---|---|---|---|---|---|---|
|
Measure the resistance according to the value(s) in the table below.
| Standard Resistance | ||||||
|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE NO. 1 HEADLIGHT ECU SUB-ASSEMBLY RH Click here |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR |