CAUTION / NOTICE / HINT
Tech Tips
Use the same procedure as for the LHD and RHD vehicles.
The procedure listed below is for the LHD vehicles.
PROCEDURE
INSTALL METER HOOD SUB-ASSEMBLY
INSTALL NO. 2 INSTRUMENT PANEL HOLE COVER
REMOVE VSC OFF SWITCH (NO. 2 COMBINATION SWITCH ASSEMBLY)
Remove the 2 screws and VSC OFF switch (No. 2 combination switch assembly) from the meter hood sub-assembly.