| DTC Code | DTC Name |
|---|---|
| C1311/11 | Open in Main Relay 1 Circuit |
| C1312/12 | Short in Main Relay 1 Circuit |
| C1313/13 | Open in Main Relay 2 Circuit |
| C1314/14 | Short in Main Relay 2 Circuit |
DESCRIPTION
The ABS main relay supplies power to the changeover solenoid and the linear solenoid.
The ABS main relay remains on for approximately 2 minutes after the engine switch is turned off and the input of brake pedal operation signals stops, and supplies power to the system to keep it ready to operate.
| DTC No. | Detection Item | INF Code | DTC Detection Condition | Trouble Area | Note |
|---|---|---|---|---|---|
| C1311/11 | Open in Main Relay 1 Circuit | 1 | Either of the following is detected:
|
|
Electronically controlled brake system DTC |
| C1312/12 | Short in Main Relay 1 Circuit | 3 | The ABS main relay 1 contact is turned ON (BS01 terminal voltage 6.5 V or more) for 1 second or more when the ABS main relay 1 OFF is requested. |
|
Electronically controlled brake system DTC |
| C1313/13 | Open in Main Relay 2 Circuit | 4 | Either of the following is detected:
|
|
Electronically controlled brake system DTC |
| C1314/14 | Short in Main Relay 2 Circuit | 6 | The ABS main relay 2 contact is turned ON (BS02 terminal voltage 6.5 V or more) for 1 second or more when the ABS main relay 2 OFF is requested. |
|
Electronically controlled brake system DTC |
| DTC No. | Brake warning light / yellow (minor malfunction) code | ABS warning light code | Slip indicator light code | Brake hold standby indicator light code |
|---|---|---|---|---|
| C1311 | 11 | 42 | 45 | 21 |
| C1312 | 12 | 42 | 45 | 21 |
| C1313 | 13 | 42 | 45 | 21 |
| C1314 | 14 | 42 | 45 | 21 |
CAUTION / NOTICE / HINT
Note
When replacing the skid control ECU assembly, perform initialization and calibration of the linear solenoid valve.
Inspect the fuses for circuits related to this system before performing the following procedure.
PROCEDURE
PERFORM ACTIVE TEST USING GTS (ABS MAIN RELAY)
Connect the GTS to the DLC3.
Turn the engine switch on (IG).
Select the Active Test on the GTS.
| Tester Display | Measurement Item | Control Range | Diagnostic Note |
|---|---|---|---|
| ECB Main Relay | ABS main relay 1 | Relay ON/OFF | ECB: Electronically Controlled Brake System |
| ECB Main Relay2 | ABS main relay 2 | Relay ON/OFF | ECB: Electronically Controlled Brake System |
| Tester Display |
|---|
| ECB Main Relay |
ECB: Electronically Controlled Brake System
| Tester Display |
|---|
| ECB Main Relay2 |
ECB: Electronically Controlled Brake System
Select the Data List on the GTS.
| Tester Display | Measurement Item | Range | Normal Condition | Diagnostic Note |
|---|---|---|---|---|
| ECB Main Relay | ABS main relay 1 | ON or OFF | ON: Relay on OFF: Relay off |
ECB: Electronically Controlled Brake System |
| ECB Main Relay2 | ABS main relay 2 | ON or OFF | ON: Relay on OFF: Relay off |
ECB: Electronically Controlled Brake System |
| Tester Display |
|---|
| ECB Main Relay |
| ECB Main Relay2 |
ECB: Electronically Controlled Brake System
Check that the condition of the ABS main relay observed on the GTS changes according to GTS operation.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| B |
|
CHECK HARNESS AND CONNECTOR (+BI TERMINAL) Click here |
| A |
|
INSPECT SKID CONTROL ECU ASSEMBLY (SOLENOID POWER SUPPLY OUTPUT TERMINAL)
| *a | Component with harness connected (Skid Control ECU Assembly) |
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (SOLENOID POWER SUPPLY OUTPUT CIRCUIT) |
| OK |
|
RECONFIRM DTC
Clear the DTCs.
Turn the engine switch off.
Turn the engine switch on (IG).
Check if the same DTC is output.
| Result | ||||||
|---|---|---|---|---|---|---|
|
| A |
|
USE SIMULATION METHOD TO CHECK Click here |
| B |
|
REPLACE SKID CONTROL ECU ASSEMBLY for RHD: Click here |
CHECK HARNESS AND CONNECTOR (+BI TERMINAL)
| *a | Front view of wire harness connector (to Skid Control ECU Assembly) |
Make sure that there is no looseness at the locking part and the connecting part of the connectors.
Disconnect the A9 and A11 skid control ECU assembly connectors.
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (+BI CIRCUIT) |
| OK |
|
INSPECT SKID CONTROL ECU ASSEMBLY (SOLENOID POWER SUPPLY OUTPUT TERMINAL)
| *a | Component with harness connected (Skid Control ECU Assembly) |
Reconnect the A8 and A11 skid control ECU assembly connectors.
Turn the engine switch on (IG).
Measure the voltage according to the value(s) in the table below.
| Standard Voltage | |||||||||
|---|---|---|---|---|---|---|---|---|---|
|
| Result | |||
|---|---|---|---|
|
| OK |
|
REPLACE SKID CONTROL ECU ASSEMBLY for RHD: Click here |
| NG |
|
REPAIR OR REPLACE HARNESS OR CONNECTOR (SOLENOID POWER SUPPLY OUTPUT CIRCUIT) |