CAUTION / NOTICE / HINT
Note
After turning the engine switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work.
PROCEDURE
CHECK BATTERY
Check the battery.
| Result | |||||||
|---|---|---|---|---|---|---|---|
|
| B |
|
REPLACE BATTERY Click here |
| A |
|
CHARGE BATTERY
Charge the battery.
| Result | ||
|---|---|---|
|
| NEXT |
|
GO TO STEP 4 Click here |
REPLACE BATTERY
Replace the battery.
| Result | ||
|---|---|---|
|
| NEXT |
|
CHECK OPERATION
Turn the engine switch on (IG).
With the brake pedal depressed, move the shift lever to select neutral (N).
Push the P position switch (shift position indicator) to select park (P).
Turn the engine switch off.
Leave the vehicle as is for 60 seconds or more.
Note
Do not connect the GTS.
Do not depress brake pedal.
Do not open/close any of the doors.
Check that the electronic shift lever system operates correctly.
| Result | ||
|---|---|---|
|
| NEXT |
|
END |