POWER INTEGRATION SYSTEM OPERATION HISTORY LIST

Note


  • The History of Reason for Operation is stored in the main body ECU (multiplex network body ECU). Because the stored fuse shut off history is cleared when the cable is disconnected from the battery terminal, do not perform work involving disconnecting the cable from the battery terminal until the end of checking and recording.

  • During inspection at the workshop, if you perform an operation before saving the fuse shut off history, the existing fuse shut off history may be cleared.

  • With the "Read Fuse Shut Off History" function, the fuse shut off history time is calculated from the "Current time in the GTS" and "Time counter in the control ECU". Therefore, accurately adjust the current time in the GTS before reading the fuse shut off history.


  1. FUSE SHUT OFF HISTORY

    Tech Tips

    Fuse shut off history: The fuse shut off history for the semiconductor power integration ECU is stored by the main body ECU (multiplex network body ECU) and can be read using the GTS.


    1. No. 1 semiconductor power integration ECU


      1. Connect the GTS to the DLC3.

      2. Turn the engine switch on (IG).

      3. Turn the GTS on.

      4. Enter the following menus: Body Electrical / Power Integration No. 1 / Utility / Fuse Shut Off History.


        Body Electrical > Power Integration No.1 > Utility
        Tester Display
        Fuse Shut Off History
    2. No. 3 semiconductor power integration ECU


      1. Connect the GTS to the DLC3.

      2. Turn the engine switch on (IG).

      3. Turn the GTS on.

      4. Enter the following menus: Body Electrical / Power Integration No. 3 / Utility / Fuse Shut Off History.


        Body Electrical > Power Integration No.3 > Utility
        Tester Display
        Fuse Shut Off History