BATTERY REMOVAL

CAUTION / NOTICE / HINT

The necessary procedures (adjustment, calibration, initialization or registration) that must be performed after parts are removed and installed, or replaced during battery removal/installation are shown below.

Note


  • After turning the power switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work.

    Click here

  • When replacing the battery, use a new battery of the same dimensions with a capacity of 51 Ah or more at a 20-hour rate.

  • After replacing the battery, install the ventilation hole plug supplied with the new battery or the ventilation hole plug from the old battery to the ventilation hole on the side to which the battery hose is not connected.

Necessary Procedure After Parts Removed/Installed/Replaced
Replacement Part or Procedure Necessary Procedure Effect/Inoperative when not Performed Link
Disconnect cable from negative battery terminal Memorize steering angle neutral point LKA /LDA system

Click here

Pre-collision system
Parking assist monitor system

Click here

Steering sensor zero point calibration Variable gear ratio steering system

Click here

PROCEDURE


  1. REMOVE NO. 2 DECK BOARD

    Click here

  2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

    Click here

  3. REMOVE BATTERY

    Click here