GENERATOR INSTALLATION

PROCEDURE


  1. INSTALL GENERATOR ASSEMBLY


    1. Install the wire harness bracket with the bolt to the generator assembly.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    2. Using an E8 "TORX" socket wrench, temporarily install the generator assembly with the 2 stud bolts.

    3. Tighten the 2 stud bolts.

      Torque:
      10 N*m  { 102 kgf*cm, 7 ft.*lbf }
    4. B000WM2C02
      *1 Engine Wire Bracket

      Install the bolt B and 2 nuts.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    5. Install the engine wire bracket with the bolt A.

      Torque:
      43 N*m  { 438 kgf*cm, 32 ft.*lbf }
    6. Install the oil cooler tube bracket with the bolt.

      Torque:
      5.5 N*m  { 56 kgf*cm, 49 in.*lbf }
    7. Install the oil cooler tube with the bolt.

      Torque:
      22 N*m  { 224 kgf*cm, 16 ft.*lbf }
    8. Connect the generator assembly connector.

    9. Connect the engine wire to the terminal B with the nut.

      Torque:
      12 N*m  { 122 kgf*cm, 9 ft.*lbf }
    10. Install the terminal cap.

    11. Attach the clamp.

    12. Connect the engine wire with the bolt.

      Torque:
      21 N*m  { 214 kgf*cm, 15 ft.*lbf }
    13. Attach the 2 clamps.

  2. INSTALL FRONT STABILIZER BAR BRACKET BOLT


    1. Install the bolt and specer nut to the front frame crossmenber sub-assembly.

      Torque:
      120 N*m  { 1224 kgf*cm, 89 ft.*lbf }
  3. INSTALL FAN AND GENERATOR V BELT

    Click here

  4. INSTALL OIL COOLER ASSEMBLY

    Click here

  5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here