GENERATOR REMOVAL

CAUTION / NOTICE / HINT

The necessary procedures(adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the generator assembly removal/installation are shown below.

Necessary Procedure After Parts Removed/Installed/Replaced
Replacement Part or Procedure Necessary Procedure Effect/Inoperative when not Performed Link
Disconnect cable from negative battery terminal Memorize steering angle neutral point LKA /LDA system

Click here

Pre-collision system
Parking assist monitor system

Click here

Steering sensor zero point calibration Variable gear ratio steering system

Click here

PROCEDURE


  1. PRECAUTION

    Note

    After turning the engine switch off, waiting time may be required before disconnecting the cable from the negative (-) battery terminal. Therefore, make sure to read the disconnecting the cable from the negative (-) battery terminal notices before proceeding with work.

    Click here

  2. DISCONNECT CABLE FROM NEGATIVE BATTERY TERMINAL

    Note

    When disconnecting the cable, some systems need to be initialized after the cable is reconnected.

    Click here

  3. REMOVE OIL COOLER ASSEMBLY

    Click here

  4. REMOVE FAN AND GENERATOR V BELT

    Click here

  5. REMOVE FRONT STABILIZER BAR BRACKET BOLT


    1. B000UPT

      Remove the bolt and specer nut from the front frame crossmenber sub-assembly.

  6. REMOVE GENERATOR ASSEMBLY


    1. B000VPG

      Detach the 2 clamps.

    2. Remove the bolt and disconnect the engine wire.

    3. B000VQBC02
      *1 Terminal Cap
      *2 Oil Cooler Tube
      *a Bolt
      *b Nut

      Remove the terminal cap.

    4. Detach the clamp.

    5. Remove the nut and disconnect the engine wire from terminal B.

    6. Disconnect the generator assembly connector.

    7. Remove the bolt and disconnect the oil cooler tube.

    8. B000YFG

      Remove the bolt and oil cooler bracket.

    9. B000WM2C02
      *1 Engine Wire Bracket

      Remove the bolt A and engine wire bracket.

    10. Remove the bolt B and 2 nuts.

    11. B000VE3

      Using an E8 "TORX" socket wrench, remove the 2 stud bolts and generator assembly.

    12. Remove the bolt and wire harness bracket from the generator assembly.