SPARK PLUG REMOVAL

CAUTION / NOTICE / HINT

The necessary procedures (adjustment, calibration, initialization, or registration) that must be performed after parts are removed, installed, or replaced during the ignition coil and spark plug removal/installation are shown below.

Necessary Procedure After Parts Removed/Installed/Replaced
Replacement Part Necessary Procedure Effect/Inoperative Function when Necessary Procedures are not Performed Link

  • Ignition coil assembly

  • Spark plug

Inspection after repair
  • Poor idle, etc.

  • Engine start function, etc.


PROCEDURE


  1. REMOVE V-BANK COVER SUB-ASSEMBLY

    Click here

  2. REMOVE IGNITION COIL ASSEMBLY

    Click here

  3. REMOVE SPARK PLUG

    B000WUCC01
    *a for Bank 1
    *b for Bank 2

    1. Remove the 8 spark plugs from the cylinder head sub-assembly and cylinder head LH.

      Note

      If a spark plug has been struck or dropped, replace it.

      Tech Tips

      Arrange the removed parts in the correct order.