Click here

ROOF HEADLINING DISASSEMBLY

Click here
Click here Click here

PROCEDURE


  1. Click here

    REMOVE NO. 2 ROOF SILENCER (for Normal Roof)


    1. B0070B7

      Remove the No. 2 roof silencer.

  2. Click here

    REMOVE NO. 4 ROOF SILENCER (for Normal Roof)


    1. B006YR2

      Remove the No. 4 roof silencer.

  3. Click here

    REMOVE VANITY LIGHT ASSEMBLY

    Tip:

    Use the same procedure for the RH side and LH side.


    1. B006XGYC01
      *1 Bulb Holder
      *a Claw (A)
      *b Claw (B)

      Disengage the 2 claws (A) and separate the bulb holder from the vanity light assembly as shown in the illustration.

    2. Disengage the claw (B) to remove the vanity light assembly.

  4. Click here

    REMOVE NO. 2 ANTENNA CORD SUB-ASSEMBLY

    Click here

  5. Click here

    REMOVE NO. 1 ROOF WIRE (for Normal Roof)


    1. B006XGXC01
      B006Y8C Adhesive Tape - -

      Remove the adhesive tape from the roof headlining assembly.

    2. B006XWHC01
      *A for LHD with Humidity Sensor - -
      *a 90° - -
      B006ZFL Rotation Direction - -

      Turn the 2 visor connectors counterclockwise approximately 90° and remove them from the roof headlining assembly.

    3. Disengage each clamp and remove the No. 1 roof wire from the roof headlining assembly.

  6. Click here

    REMOVE NO. 1 ROOF WIRE (for Panoramic Moon Roof)


    1. B006Z4HC01
      B006Y8C Adhesive Tape - -

      Remove the adhesive tape from the roof headlining assembly.

    2. B006X3KC01
      *A for LHD with Humidity Sensor - -
      *a 90° - -
      B006ZFL Rotation Direction - -

      Turn the 2 visor connectors counterclockwise approximately 90° and remove them from the roof headlining assembly.

    3. Disengage each clamp and remove the No. 1 roof wire from the roof headlining assembly.