PROCEDURE
TEMPORARILY INSTALL AIR CONDITIONER UNIT ASSEMBLY
w/ Claw:
Engage the 2 claws.
Temporarily install the air conditioner unit assembly to the instrument panel reinforcement assembly with the 3 bolts.
INSTALL INSTRUMENT PANEL REINFORCEMENT ASSEMBLY WITH AIR CONDITIONER UNIT ASSEMBLY
Note
Be sure to support the air conditioner unit assembly when installing it. Failure to do so may cause the bracket of the air conditioner unit assembly to break.
When installing the air conditioner unit assembly, eliminate static electricity by touching the vehicle body to prevent the components from being damaged.
Connect each connector.
| *A | for LHD | *B | for RHD |
|
Install in this Direction | - | - |
Engage each clamp.
Temporarily install the instrument panel reinforcement assembly with air conditioner unit assembly as shown in the illustration.
Install the 4 bolts (A).
Connect the brake pedal assembly with the bolt (B).
Temporarily install the nut.
Install the 3 bolts.
Install the 2 hole plugs.
| *a | Lip |
Install a new cooler unit drain hose grommet.
Note
If the drain cooler hose is disconnected from the cooler unit drain hose grommet, make sure to replace the cooler unit drain hose grommet with a new one. Failure to do so may lead to water ingress.
Make sure that the entire lip of the cooler unit drain hose grommet is securely engaged to the vehicle body.
Connect the drain cooler hose.
Install the front floor mat to its original position as shown in the illustration.
| *A | w/ Smart Entry and Start System |
| *a | Lock Lever |
|
Move in this Direction |
Engage each clamp.
Temporarily connect the connector and then move the lock lever in the direction indicated by the arrow to securely connect the connector.
Note
When connecting any airbag connector, take care not to damage the airbag wire harness.
Check that there is no looseness in the installed parts of the airbag sensor assembly.
w/ Smart Entry and Start System:
Connect the connector.
for LHD:
Engage each clamp.
Connect the connector holder with the 2 nuts.
Connect the 3 earth wires with the 3 bolts.
Connect the connector.
for RHD:
Engage the clamp.
Connect the connector holder with the 2 nuts.
Engage each clamp.
Connect the 3 earth wires with the 3 bolts.
Connect each connector.
INSTALL NO. 2 AIR DUCT SUB-ASSEMBLY
Engage the 4 claws to install the No. 2 air duct sub-assembly.
INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY WITH MAIN BODY ECU (for LHD)
INSTALL ECU INTEGRATION BOX RH (for RHD)
w/ ECU Integration Box RH:
INSTALL NO. 3 INSTRUMENT PANEL TO COWL BRACE SUB-ASSEMBLY
Install the No. 3 instrument panel to cowl brace sub-assembly with the bolt and nut.
Engage each clamp.
INSTALL NO. 2 INSTRUMENT PANEL BRACE SUB-ASSEMBLY
Install the No. 2 instrument panel brace sub-assembly with the bolt and nut.
Temporarily install the screw.
Tech Tips
Do not fully tighten the screw.
Engage each clamp.
for LHD:
Connect the relay block assembly with the bolt (B).
Connect the earth wire with the bolt (A).
for RHD:
Connect the earth wire with the bolt.
INSTALL NO. 1 INSTRUMENT PANEL BRACE SUB-ASSEMBLY
Install the No. 1 instrument panel brace sub-assembly with the bolt and nut.
Temporarily install the screw.
Tech Tips
Do not fully tighten the screw.
Engage each clamp.
for LHD:
Connect the earth wire with the bolt.
for RHD:
Connect the relay block assembly with the bolt (B).
Connect the earth wire with the bolt (A).
INSTALL AIR CONDITIONER UNIT ASSEMBLY
for LHD:
Tighten the 3 bolts, 2 screws and nut to install the air conditioner unit assembly.
|
Bolt | |
Screw |
|
Nut | - | - |
Note
Tighten the bolts, screws and nut in the order shown in the illustration.
for RHD:
Tighten the 3 bolts, 2 screws and nut to install the air conditioner unit assembly.
|
Bolt | |
Screw |
|
Nut | - | - |
Note
Tighten the bolts, screws and nut in the order shown in the illustration.
INSTALL NO. 3 DASH PANEL INSULATOR PAD
Install the No. 3 dash panel insulator pad with 2 new clips as shown in the illustration.
INSTALL NO. 1 CONSOLE BOX DUCT
|
Install in this Direction |
Install the No. 1 console box duct as shown in the illustration.
INSTALL FLOOR CARPET BRACKET LH
|
Install in this Direction |
Engage the claw as shown in the illustration.
Install the floor carpet bracket LH with the clip.
INSTALL FLOOR CARPET BRACKET RH
|
Install in this Direction |
Engage the claw as shown in the illustration.
Install the floor carpet bracket RH with the clip.
INSTALL REAR NO. 3 AIR DUCT
Engage the 2 claws to install the rear No. 3 air duct.
INSTALL REAR NO. 4 AIR DUCT
|
Install in this Direction |
Engage the 4 claws to install the rear No. 4 air duct as shown in the illustration.
Install the front floor carpet assembly to its original position as shown in the illustration.
Engage the 2 guides.
Install the 2 front floor carpet clips.
INSTALL REAR NO. 1 AIR DUCT
Engage the 2 claws to install the rear No. 1 air duct.
INSTALL REAR NO. 2 AIR DUCT
|
Install in this Direction |
Engage the 4 claws to install the rear No. 2 air duct as shown in the illustration.
Install the front floor carpet assembly to its original position as shown in the illustration.
Engage the 2 guides.
Install the front floor carpet clip.
for LHD:
Install the front floor carpet clip.
INSTALL FRONT FLOOR CAUTION PLATE COVER
|
Install in this Direction (1) |
|
Install in this Direction (2) |
Engage the guide and claw to install the front floor caution plate cover as indicated by the arrows, in the order shown in the illustration.
INSTALL ACCELERATOR PEDAL
for 2AR-FE:
for A25A-FKS:
for 2GR-FKS:
INSTALL ACCELERATOR PEDAL PAD
for 2AR-FE:
for A25A-FKS:
for 2GR-FKS:
INSTALL COOLER (ROOM TEMP. SENSOR) THERMISTOR (for Automatic Air Conditioning System)
Connect the aspirator and connector to install the cooler (room temp. sensor) thermistor.
INSTALL CENTRAL GATEWAY ECU (NETWORK GATEWAY ECU) (w/o Smart Entry and Start System)
for LHD:
for RHD:
INSTALL ECU INTEGRATION BOX RH (for LHD)
w/ ECU Integration Box RH:
INSTALL INSTRUMENT PANEL JUNCTION BLOCK ASSEMBLY WITH MAIN BODY ECU (for RHD)
INSTALL DOOR CONTROL BATTERY (w/ Door Control Battery)
INSTALL NO. 1 CLEARANCE WARNING BUZZER (for LHD)
w/ TOYOTA Parking Assist-sensor System:
INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSEMBLY
INSTALL STEERING COLUMN ASSEMBLY
for Manual Tilt and Manual Telescopic Steering Column:
for Power Tilt and Power Telescopic Steering Column:
INSTALL TRANSMISSION FLOOR SHIFT ASSEMBLY
for UA80E:
for UB80E:
for U760E:
INSTALL FRONT SEAT ASSEMBLY LH
for Manual Seat:
for Power Seat:
INSTALL FRONT SEAT ASSEMBLY RH
Tech Tips
Use the same procedure as for the LH side.
CONNECT AIR CONDITIONING TUBE AND ACCESSORY ASSEMBLY
Remove the vinyl tape from the air conditioning tube and accessory assembly.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the air conditioning tube and accessory assembly.
| Compressor Oil |
|---|
| ND-OIL 8 or equivalent |
Install the O-ring to the air conditioning tube and accessory assembly.
Note
Keep the O-ring and O-ring fitting surface free of foreign matter.
Connect the air conditioning tube and accessory assembly.
CONNECT SUCTION PIPE SUB-ASSEMBLY
Remove the vinyl tape from the suction pipe sub-assembly.
Sufficiently apply compressor oil to a new O-ring and the fitting surface of the suction pipe sub-assembly.
| Compressor Oil |
|---|
| ND-OIL 8 or equivalent |
Install the O-ring to the suction pipe sub-assembly.
Note
Keep the O-ring and O-ring fitting surface free of foreign matter.
Connect the suction pipe sub-assembly.
Rotate the hook connector as shown in the illustration.
Insert the tube joint into the fitting hole securely and install the bolt.
CONNECT INLET HEATER WATER HOSE
for A25A-FKS:
| *a | View A |
| *b | Marking (White) |
| *c | Clip Installation Angle (270°) |
Connect the inlet heater water hose with the marking facing up and engage the clip within the area shown in the illustration.
Note
Do not apply excessive force to the inlet heater water hose.
except A25A-FKS:
| *a | View A |
| *b | for 2AR-FE: Marking (Red) for 2GR-FKS: Marking (Purple) |
| *c | Clip Installation Angle (270°) |
Connect the inlet heater water hose with the marking facing up and engage the clip within the area shown in the illustration.
Note
Do not apply excessive force to the inlet heater water hose.
CONNECT OUTLET HEATER WATER HOSE
| *a | View A |
| *b | for 2AR-FE: Marking (Red) for A25A-FKS: Marking (Red) for 2GR-FKS: Marking (Purple) |
| *c | Clip Installation Angle (270°) |
Connect the outlet heater water hose with the marking facing up and engage the clip within the area shown in the illustration.
Note
Do not apply excessive force to the outlet heater water hose.
INSTALL FRONT CENTER UPPER SUSPENSION BRACE SUB-ASSEMBLY
for LHD:
for RHD:
INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
ADD ENGINE COOLANT
for 2AR-FE:
for A25A-FKS:
for 2GR-FKS:
INSPECT FOR COOLANT LEAK
for 2AR-FE:
for A25A-FKS:
for 2GR-FKS:
CHARGE AIR CONDITIONING SYSTEM WITH REFRIGERANT
WARM UP ENGINE
INSPECT FOR REFRIGERANT LEAK